On November 2019, the contract for six new offshore patrol vessels for the French overseas territories was awarded to Socarenam. The fleet will be operated by the French Navies and will be deployed in New Caledonia, French Polynesia, and Reunion.
With a length of 80m, a beam of 11.8m and a displacement of 1,300 tons in fully loaded condition, the POM (“Patrouilleurs d’Outre Mer”) will have a draught of 3.5m. They are designed to operate in harsh weather for typical 30 days missions.
With the objective of operating two intervention crafts and drones day and night, including in rough seas, the stabilisation of the vessels is a key point regarding their intervention capability. The choice of StabInSea’s passive stabilisation solution was based on an in-depth technical audit to guarantee the end client a high level of satisfaction.
PROJECT STATUS: DELIVERED
Client
MAIN CHARACTERISTICS
Length: | 80 m overall |
Width: | 11,8 m |
Displacement: | 1 300 t |
Commissioning date: | 2022 to 2025 |
Contact
+ 33 (0)2 40 45 97 74
StabInSea
1 route de la Croix Moriau
44350 Guérande
France